Inquiry
Form loading...

Industry News

Large-Diameter DTH Air Supply: One Rig, Two Compressors?

Large-Diameter DTH Air Supply: One Rig, Two Compressors?

2026-08-07

Choosing between one large compressor and two parallel units for large-diameter DTH drilling shapes your rig uptime, fuel burn, and hole quality from the first meter down.

view detail
Why DTH Hammers Burn Out Early: 5 Compressor Mismatch Mistakes

Why DTH Hammers Burn Out Early: 5 Compressor Mismatch Mistakes

2026-08-06

Five preventable compressor-to-hammer matching errors that silently destroy your DTH hammer months ahead of schedule, and how to fix each one before your next drill string change.

view detail
How Much Pressure Does a DTH Hammer Really Need? From Utility Holes to 35 Bar Deep Wells

How Much Pressure Does a DTH Hammer Really Need? From Utility Holes to 35 Bar Deep Wells

2026-08-05

DTH hammer operating pressure is the most important parameter for drilling productivity and hammer longevity, and the pressure is driven by 4 factors

view detail
Sizing an Air Compressor for Blast Hole Drilling: CFM by Hole Diameter and Bench Height

Sizing an Air Compressor for Blast Hole Drilling: CFM by Hole Diameter and Bench Height

2026-08-04

Sizing an air compressor for blast hole drilling requires matching the compressor CFM to the hole diameter, the bench height, the drill rod size, the altitude, and the drilling method. 

view detail
China Screw Air Compressor Manufacturers for Mining and Industrial Projects

China Screw Air Compressor Manufacturers for Mining and Industrial Projects

2026-08-03
If you are comparing a screw air compressor for mining and industrial projects, the right choice depends less on headline horsepower and more on duty cycle, delivered airflow, pressure stability, dust tolerance, and total lifecycle cost. In remote mining, ...
view detail
How to Plan a 500 m Water Well Drilling Project: Equipment, Crew and Budget

How to Plan a 500 m Water Well Drilling Project: Equipment, Crew and Budget

2026-07-31

 A 500 m water well is a different project class from a 150 m residential borehole.

view detail
Water Well Drilling Cost per Meter: What Sits Behind the $18–22 Range

Water Well Drilling Cost per Meter: What Sits Behind the $18–22 Range

2026-07-30

The cost analysis is engineering-focused, but the output determines whether the project budget holds or whether overruns surface mid-drilling.

view detail
Tropical Manufacturing Plant Moisture Control: Air Dryer Sizing for High-Humidity Screw Compressor Systems

Tropical Manufacturing Plant Moisture Control: Air Dryer Sizing for High-Humidity Screw Compressor Systems

2026-07-24

Sizing air dryers for tropical screw compressors requires humidity, temperature, and dew point data.

view detail
Remote Mine Air Supply Planning: Piston Compressor Reliability for Sites Without Service Infrastructure

Remote Mine Air Supply Planning: Piston Compressor Reliability for Sites Without Service Infrastructure

2026-07-22

Field guide to selecting piston compressors for mining sites beyond standard service networks.

view detail
Open-Pit Blasting Equipment Selection: Why Integrated Drill-Compressor Rigs Outperform Split Systems

Open-Pit Blasting Equipment Selection: Why Integrated Drill-Compressor Rigs Outperform Split Systems

2026-07-21

Engineering comparison for mining engineers and contractors evaluating blast-hole drill equipment.

view detail